PIPELINE CONSTRUCTION FOR 2018-2019 PIPELINE PROGRAM

The Project generally consists of construction of water pipelines, installation of appurtenances, trench pavement restoration and/or replacement. Work on the Project shall be completed within 210 calendar days.
  01 Bid Set (click to expand/collapse)
Order this section, price will be calculated by SQFT
Download section as a Zip file free of charge
Order files below, price will be calculated by SQFT
Name Date Size
Lot3-Drawings 8/23/2018 1.3 MB
Lot4-Drawings 8/23/2018 1.4 MB
Lot5Drawings 8/23/2018 24.3 MB
Lots1and2Drawings 8/23/2018 1.9 MB
Lots6and7-Drawings 8/23/2018 2.1 MB
Lots8and9-Drawings 8/23/2018 1.1 MB